RediCor® is a factory-built, ready-to-set modular steel form system that simplifies and speeds up the construction of reinforced concrete stair and elevator cores.
Four Layers compressed

RediCor® is a factory-built, ready-to-set modular steel form system that simplifies and speeds up the construction of reinforced concrete stair and elevator cores.
Four Layers compressed

RediCor® is a factory-built, ready-to-set modular steel form system that simplifies and speeds up the construction of reinforced concrete stair and elevator cores.

A Simplified, Low-Cost Alternative to Conventional Core Construction

Modular construction for easy onsite installation

READY TO INSTALL MODULES

Our factory-built, structurally true modules stack like building blocks and are ready for concrete once they are set.

UPPER LEVEL ACCESS

As an option, stairs can be prefabricated and shipped in the modules, enabling early and safe access to upper levels of the structure.

SAVE TIME

Cores can be constructed simultaneously, reducing jobsite schedule by weeks or months on most building projects.

CorTek Product Details

Rapid, Easy Onsite Erection Process

RediCor’s modular steel form system and easy onsite installation allows for our factory-built, ready-to-set modules to be simultaneously stacked for up to several levels, saving time, energy and money.

RediCor-Limelite Lodge-45 copy

Modular Construction

  • Factory-built, ready-to-set modules
  • Stacks like building blocks
  • Ensures structurally true cores
  • Several cores can be constructed simultaneously
  • Minimizes costly site time
  • After concrete placement, structurally equivalent to traditional CIP concrete walls of equal thickness
DJI_0033-COMPRESSED cropped

Easy On-Site Installation

  • Optional stair rails can ship inside modules
  • Concrete can be placed in module walls once set
  • Steel framing can begin once concrete cures
  • Optional stairs provide earlier and safer builder trade access to upper floors
  • Optional embeds and connections reduce poor fit-up and coordination issues among trades

Rapid, Easy Onsite Erection Process

RediCor’s structurally true, modular construction and easy onsite installation allows for our factory-built, ready-to-set modules to be simultaneously stacked for up to several levels, saving time, energy and money.

CorTek Product Details
RediCor-Limelite Lodge-45 copy

Modular Construction

  • Factory-built, ready-to-set modules
  • Stacks like building blocks
  • Ensures structurally true cores
  • Several cores can be constructed simultaneously
  • Minimizes costly site time
  • After concrete placement, structurally equivalent to traditional CIP concrete walls of equal thickness
DJI_0033-COMPRESSED cropped

Easy On-Site Installation

  • Optional stair rails can ship inside modules
  • Concrete can be placed in module walls once set
  • Steel framing can begin once concrete cures
  • Optional stairs provide earlier and safer builder trade access to floors
  • Optional embeds and connections reduce poor fit-up and coordination issues among trades

See RediCor® in Action

HomewoodSuitesScreenshots
See how RediCor® simplifies and accelerates core construction
Nelson Testimonial Screenshot
Hear a testimonial from a company that uses the RediCor® system

Factory-Built Features Tailored To Your Project

This innovative construction approach incorporates the higher level of quality and efficiency provided by a specialized factory manufacturing environment, which reduces labor costs and scheduling needs. Also a higher level of jobsite safety is provided through the elimination of the fall hazards inherent in vertical concrete formwork construction methods.

Factory-Built, High Tolerance, All-Steel Construction

All-steel form system constructed with optional vertical and horizontal structural elements designed to support construction loads after placed concrete cures. Structurally equivalent to traditional CIP concrete walls of equal thickness.

DJI_0020 re-COMPRESSED
new-DSC_2408-COMPRESSED_cropped2_new

Level the Core with the Turn of a Nut

This adjustable nut and bolt system ensures that the first module is level before stacking subsequent modules and placing concrete — saving time and money.

Optional Preinstalled Connections For Floor And Roof Framing

Optional connections for framing each level can be preinstalled at the factory to save time. Each stack would provide the tools necessary to access the upper floor, start construction, and place concrete as you go. Modules go up with floor framing and do not require stripping. Cores are compatible with steel, concrete and wood framing.

DSC_2402
DSC_4991-COMPRESSED_new

Earlier And Safer Trade Access To Floors

Provides safer, earlier, and more efficient builder trade access to floors, and enhances flexibility of construction sequence scheduling.

Optional Materials Can Be Preinstalled At The Factory

Optional Stairs Shipped in Module

Optional stairs arrive prefabricated inside each module, providing early trade access to the building floors. Optional hand rails can also ship with each module.

Structurally True Elevator Shafts

Factory-built, structurally true cores ensure rapid construction of elevator shafts.

stairs-alpha-big

Galvanized, Corrugated Steel Allows For Multiple Finish Options

Galvanized steel surface can be left exposed, painted, or covered with almost any architectural surface material.

Galvanized Corrugated steel

Pre-treated galvanized corrugated steel can be left as is.

Covered

Drywall, laminate, etc. can easily be affixed to the corrugated steel ridges.

Painted

The pre-treated galvanized steel will accept any standard wall finish.

DrywallRender-no-rebarb

Galvanized, Corrugated Steel Allows For Multiple Finish Options

Galvanized steel surface can be left exposed, painted, or covered with almost any architectural surface material.
DrywallRender-no-rebarb

Galvanized Corrugated steel

Pre-treated galvanized corrugated steel can be left as is.

Covered

Drywall, laminate, etc. can easily be affixed to the corrugated steel ridges.

Painted

The pre-treated galvanized steel will accept any standard wall finish.

Documentation

The engineering on RediCor®’s prefabricated, ready-to-set modular steel form system is well documented. Below you’ll find examples captured in photographs and manuals that demonstrate why the RediCor® system is faster, more cost competitive and safer than conventional cast-in-place, precast and masonry methods of core construction.

Standard Details

Explains how the RediCor® ready-to-set modular steel form system is engineered to simplify and speed up the construction of reinforced concrete stair and elevator core structures.

Please contact your RediCor® representative for the most current CAD blocks.

RediCor Design Manual

Contains information regarding the specification and design of the RediCor® Form System. Includes Standard Specification, Connection Details, and what is required to be provided to RediCor® by the Engineer and Architect of Record.

RediCor Installation Guide

Contains information regarding the installation of the RediCor® Form System.

RediCor Inspection Guide

Contains information regarding the inspection of the RediCor® Form System.

Standard Specification Language

Contains Guide Specification in accordance with the SI Construction Specifications Practice Guide, including Master Format, Section Format and Page Format.

Homewood Suites Construction Slideshow

A photo montage of a three story hotel using the RediCor® Modular Steel Form System.

Introductory Slideshow

Demonstrates the RediCor® Modular Steel Form System as the faster, cost competitive, safer and higher quality alternative to conventional cast-in-place, precast and masonry methods of core construction.

Videos

These time-lapse videos capture the side-by-side real-time advantage of using the RediCor Modular Steel Form System vs. conventional building methods.

Erection Process Comparison

Time-lapse video showing the time saving advantage of RediCor®’s system vs. conventional building methods.

Homewood Suites Construction

Time-lapse video of the construction of the Homewood Suites Hotel in Steamboat Springs, Colorado.                                                                                          

Lyons Testimonial Screenshot
Hear a testimonial from a company that uses the RediCor® system
RediCorSetScreenshots
See how fast RediCor® is set…